Hilliard Street Sidewalk Extension (Adams Street to Duval Street)

  • Project typeSidewalk Installation
  • Project value$ 274,350.00
  • Project scheduleCompleted Fall 2023
  • Contractor nameCosta and Son, LLC
  • Completion DateSeptember 22, 2023
FHWA Walkways Icon-Wide

General Project Information

The Town of Manchester Department of Public Works, Engineering Division proposes to install approximately 1,000 feet of 5 ft-wide concrete sidewalk on the north side of Hilliard Street between Adams Street and Duval Street.  The project will close an existing sidewalk gap in the neighborhood.

Other work includes ADA compliant sidewalk ramps, installation of a Rectangular Rapid Flashing Beacon at the easterly mid-block pedestrian crossing, erosion & sedimentation control, maintenance and protection of traffic, restoration of lawns and driveways, and other appurtenant work.

Funding

This project is in part grant funded through a Community Development Block Grant (CDBG) from the U.S. Department of Housing and Urban Development (HUD) administered through the Manchester Community Development Program. Design and Construction Inspection by the Town of Manchester Engineering Division. 

Location

Hilliard St, Manchester, CT 06045  View Map