The Town of Manchester proposes to replace concrete sidewalks on Santina Drive. Work includes removing and replacing existing sidewalks, pavement and driveway patching and restoring lawns. The sidewalks on the north side of the road will be shifted approximately 4' to the south so that the existing utility poles will not be in the new sidewalk.
Design and Bidding: April 2024 to June 2024 Construction: September 2024 to November 2024
This project is funded by the 2023 Public Works Bond Referendum.
Santina Drive, Manchester, CT 06045 View Map