Bidwell street will be closed from Hartford Road to Ramey drive starting 9/22/2026, for 30 days to allow for sewer main installation. Detour signs have been installed to help residents navigate around closure area.Salters Pool Parking Lot will be closed starting 9/21/2026, for 6-8 weeks to allow reconstruction of the parking lot. Pond access will be maintained during construction.
October 19 - November 1at Mahoney Recreation Center (Rear Entrance off Pleasant St., 110 Cedar St) from 10am-6pm. Extended hours are October 27 & 29 from 8am-8pm.
In the coming weeks, a two-person Arcadis inspection team will conduct in-home service line inspections at select Manchester residences. Team members will carry identification badges and wear Arcadis-branded safety vests. If your property is selected for inspection, you will receive a door hanger notice in advance. Please call 860-647-6050 with any questions or concerns.
CT EZ File
HOW TO APPLY FOR A UST REMOVAL/ABANDONMENT PERMIT:
Removal / Abandonment of Underground Tanks Permit Application
** Please note that the "Call Before You Dig (CBYD)#" is REQUIRED.
Removal Requirements for Underground Storage Tanks
Connecticut DCP Tank Removal Requirements - Link
Home improvement contractors conducting residential underground heating oil storage tank (UST) removal or replacement must comply with the following:
Note: UST refers to both a “residential underground heating oil storage tank system” and an “underground storage tank system” as defined in CT General Statutes 20-419.